GCC

Contractor appointed for UAE-Saudi power grid interconnection


The 400kV double-circuit overhead transmission line extends 96 kilometres from Al-Silaa in the UAE to Salwa in Saudi Arabia

Become a MEED subscriber for unlimited access to:

SUBSCRIBE To MEED

REGISTER to unlock sample content



Source link

Related posts

Saudi Arabia plans Mecca airport project

beyondmedia

Saudi’s strategic surge in water transmission and storage PPPs

beyondmedia

Contractors prepare revised bids for Al-Ula tram works

beyondmedia

Leave a Comment